108jobs

FIND YOUR NEXT JOB

Mechanical and Commissioning Manager
Negotiable

Xe-Pian Xe-Namnoy Power Company Limited (PNPC)

Capital Tower, 23 Singha Road Nongbone Saysettha Vientiane Capital

JOB DESCRIPTION

The Xe-Pian Xe-Namnoy Power Company Limited (PNPC) has been established in March 2012 under a power development cooperation between The Lao PDR, Thailand and South Korea in order to design, build, own, operate and transfer a hydroelectric power project in Champasak and Attapeu Provinces. The Xe-Pian Xe-Namnoy project marked a significant investment in the hydropower sector in the Southern part of Laos and will have a capacity of 410 MW for both international and domestic consumption. PNPC is looking for highly motivated and proactive candidates for:

Mechanical and Commissioning Manager

Work Location: Attapeu Provinces, Lao PDR

Job description and responsibilities:

  • To manage and control the test and commissioning work in accordance with work schedule requirements
  • Work closely with each party engaged in pre-commissioning, commissioning and start up activities
  • Check, review the test commissioning procedure, technical drawing, parameters and specifications to ensure adequate provision have been made for test and must be matched with PTS/GTS, designed and contract
  • To control Contractor Test and commissioning including make the decision to acceptance at the final of testing
  • Supervise the function for assigned test adhering to contract requirements
  • Ensure that all of Mechanical parameters of Test and commissioning is accurate as said in the test and commission procedure
  • Troubleshooting and solving the issue, suggesting solutions and reporting the result during Test Commissioning
  • Provide technical advice and guidance to the contractor for operation and maintenance during commissioning and after COD
  • Participate in commissioning activity, analyses the test reports and generate the punch list
  • Supervises preventive and corrective works and to perform technical evaluation of quotations for addition work from O&M
  • To be in charge of investigation Equipment discrepancy during the test commissioning as well as report to E&M Team Leader
  • Perform other tasks as assigned by the E&M Team Leader

Qualification:

  • Bachelor Degree in Mechanical/hydraulic/ related field in hydro power/test and commissioning
  • More than 10 years’ experience in hydro power plant
  • Ability to problem solve and work with colleagues from other engineering disciplines
  • Good communication skills and team-working capabilities
  • Experience reading and interpreting technical drawing and manual with strong analytical and trouble shooting
  • Strong knowledge & Skills in field of hydro power test and commissioning
  • Fluent in English (reading, writing and speaking)

An attractive and competitive salary will be offered for a successful candidate based upon experience.

Application closing date is 26 August 2019

Please submit your CV with references, a Letter of Interest and expected salary for the post you are applying for, a recent photograph, contact details, copy of work records and copy of education certificates to:

Human Resources Department, Xe-Pian Xe-Namnoy Power Company Limited (PNPC), Capital Tower, 23 Singha Road, Xaysettha District, Vientiane Capital, Lao P.D.R., Email: recruitment@pnpclaos.com

Remark: Only short-listed candidates will be contacted for an interview.

Xe-Pian Xe-Namnoy Power Company Limited (PNPC)

Xe-Pian Xe-Namnoy Power Company Limited (PNPC)

Capital Tower, 23 Singha Road Nongbone Saysettha Vientiane Capital

Contact
Contact Name : N/A
Email : recruitment@pnpclaos.com
ABOUT COMPANY

Xe-Pian Xe-Namnoy Power Company Limited (PNPC) has been established since March 2012 under a power development cooperation between Lao P.D.R, Korea and Thailand in order to design, build and operate the Xe-Pian Xe-Namnoy Hydroelectric Project in Champasak and Attapeu Provinces. The Xe-Pian Xe-Namnoy Hydroelectric Project bequeaths a significant investment in the hydropower sector in the South of Lao P.D.R, and will have a capacity of 410 MW for both international and domestic consumption.

Company Map

Confirm this job

URGENT JOBS  

Confirm apply all job

    Your job selected is empty.